
Remedial Action Sites in Arizona
Remedial Action Sites are contaminant sites in Arizona being investigated and remediated under the following Arizona and federal environmental programs:
Buffer zones around remedial action sites have been prescribed by state statute and rule to delineate the entire boundaries within which additional technical review of Notices of Intent to Drill and Well Permits is required by ADWR. The statute and rule prescribes a one-mile buffer around WQARF, CERCLA, and DOD IRP sites, a one-half mile buffer around VRP and RCRA sites, and a 500 feet buffer around LUST sites. |
Remedial Action Sites and Groundwater Basins |
| ADWR recommends viewing the Department of Environmental Quality’s interactive maps webpageof other groundwater contamination sites, such as those under the authority of the Uranium Mill Tailings Remedial Action (UMTRA) program of the U.S. Department of Energy, are also shown. |
Soon to Come |
Maps (11 inches x 17 inches; pdf format) of individual groundwater basins that contain remedial action sites are available for download below: |
Hydrology Division Navigation Links
Use the above links to navigate the Hydrology Division

Arizona Department of Water Resources






